Location: Fairfax County, VA
The existing 12,000 SF facility wasn’t meeting the needs of its swimmers. The 30-year old facility’s pool equipment required constant maintenance, the deck suffered from drainage problems, and the mechanical system didn’t meet current standards.
The existing pool and deck were demolished and replaced with a 25-yard, six-lane lap pool, a therapy pool, and a zero-depth entry area. Each pool has its own water temperature to respond to the different needs of its swimmers. The entire HVAC system was replaced. In addition to the pool renovation, the locker rooms were updated and a new control desk was added.